Measure the item. Check the pack. Confirm the delivery.Explore the global TB platform
FREE METRIC DEMOS

Read the formula behind the material subtotal.

Calculate slab volume, whole blocks and tile boxes with editable illustrative KES rates.

EDIT THE ASSUMPTIONS

Measure. Allow. Round. Review.

Defaults: 12.6 m³ concrete, 342 blocks and 23 boxes. Material examples, not complete project quotations.

Concrete slab: quantity & material cost

Adjust the dimensions, allowance and example rate. Review the formula behind the result.

KES rates are illustrative editable inputs, not Kenyan market averages or supplier quotations. Confirm actual material, dimensions, allowance and delivery basis.

L × W × T
EXAMPLE MATERIAL SUBTOTAL
—

Build a detailed estimate in TB

This demo runs in your browser. Inputs are not saved or automatically transferred into a TB project.

KNOW THE BOUNDARY

One material calculation at a time.

Concrete

Volume of a uniform slab, not a cement-bag count or mix design.

Blocks

Editable nominal face dimensions, not a universal Kenyan stone size.

Tiles

Area plus allowance divided by actual box coverage, rounded up.

Use actual project information

Confirm dimensions, specifications, allowance and quotation scope. Rates are illustrative. Inputs stay in this browser without automatic saving or transfer.

Explore main TB calculators

BEFORE THE NEXT RENOVATION QUOTE OR MATERIAL ORDER

Make the next purchase easier to explain.

Explore quantities, material purchasing, editable costs and resources in TrendyBuilders. Choose capacity for your own work or a team.

Make every allowance explainable.See plans